The Path

Idea to shipped product. Ten stations, in order.

Ten stations from idea to shipped product. Each one lists what happens, typical timing, and the Shenzhen and Dongguan companies that do that work.
Next meetup
SZDIY open night (weekly)Details →
  1. 01设计

    Design

    Design & engineering

    Industrial design, mechanical and electrical engineering. Get a real design-for-manufacturing review before you spend on tooling.

    Lead2–8 weeks · 13 firms
  2. 02手板

    Prototype

    Prototyping

    Looks-like and works-like models: CNC, SLA, urethane casting. In Shenzhen this takes days, not weeks.

    Lead3–10 days · 31 firms
  3. 03电子

    Electronics

    PCB & assembly

    Board fab, SMT assembly, component sourcing — and Huaqiangbei for the parts you need tomorrow.

    Lead1–3 weeks · 21 firms
  4. 04开模

    Tooling

    DFM & tooling

    Getting a mold made: steel grades, T1 samples, and making sure the tool is legally yours.

    Lead3–6 weeks · 20 firms
  5. 05试产

    EVT · DVT · PVT

    Pilot builds

    Three builds with a contract manufacturer, each proving something different before mass production.

    Lead6–16 weeks · 12 firms
  6. 06认证

    Certification

    Certification

    FCC, CE, UL, CCC and battery transport — the Shenzhen labs that test and file.

    Lead2–6 weeks · 9 firms
  7. 07品质

    Quality

    Quality control

    Factory audits, in-line and pre-shipment inspection, golden samples.

    LeadOngoing · 12 firms
  8. 08包装

    Packaging

    Packaging

    Retail boxes, inserts, manuals and labels, printed down the road from your factory.

    Lead2–4 weeks · 7 firms
  9. 09物流

    Logistics

    Logistics

    Freight forwarders, Hong Kong consolidation, and 3PLs that ship to your customers.

    Lead1–6 weeks · 6 firms
  10. 10融资

    Funding

    Funding & legal

    Accelerators, IP protection, company setup and paying suppliers safely.

    Lead1 firm