Skip to content
Shenzhen Makers深圳创客

PR-18 · Process hubs

Contract manufacturing / box build 代工组装

How it works, typical cost and lead time, and the shops that do it.
Next meetup
SZDIY open night (weekly)Details →

Shops for this process

Foreign-owned

Foreign-owned, foreign-managed factory (Sofeast group) with English-speaking staff in every department

Dongguan · Chang'an
Makes in-housePrototypesLow volumeMass production
Contract manufacturing / box buildPCB assembly (SMT/PCBA)Injection moldingSilicone & LSR molding
Native-English project managerSource ↗

Sister PCB and PCBA factories in the same Fuyong industrial park

Shenzhen · Bao'an
Makes in-housePrototypesLow volume
PCB fabricationPCB assembly (SMT/PCBA)Electronic component sourcingContract manufacturing / box build
English-speaking salesSource ↗
Foreign-owned

Swiss-listed Cicor Group's EMS plant in Dongguan

Dongguan · Dongguan (other town)
Makes in-house
Contract manufacturing / box buildPCB assembly (SMT/PCBA)Contract manufacturerFactory
English-speaking salesSource ↗

Medical-device contract design and manufacturing since 2002

Hong Kong
Makes in-houseLow volumeMass production
Contract manufacturing / box buildInjection moldingSilicone & LSR moldingProduct design & engineering
English-speaking salesSource ↗
Foreign-managed

German-founded (2012) design-to-production firm with Berlin and Shenzhen offices

Shenzhen · Bao'an
PrototypesLow volumeMass production
Rapid prototyping (multi-process)PCB assembly (SMT/PCBA)Contract manufacturing / box buildProduct design & engineering
English-speaking salesSource ↗

Advanced boards: up to 64 layers, HDI, rigid-flex, RF and ceramic

Shenzhen · Bao'an
Makes in-housePrototypesLow volumeMass production
PCB fabricationPCB assembly (SMT/PCBA)Electronic component sourcingContract manufacturing / box build
English-speaking salesSource ↗

English-speaking NPI partner for startups, builds from 5 units

Shenzhen · Longhua
Partner networkPrototypesLow volumeMass production
PCB assembly (SMT/PCBA)Injection moldingSheet metal fabricationCNC machining
English-speaking salesSource ↗

No-MOQ turnkey PCBA with a startup program

Shenzhen · Bao'an
Makes in-housePrototypesLow volumeMass production
PCB assembly (SMT/PCBA)PCB fabricationElectronic component sourcingCables & wire harnesses
English-speaking salesSource ↗

AI instant quote for PCB, PCBA, BOM and box build

Shenzhen · Bao'an
Makes in-housePrototypesLow volumeMass production
PCB assembly (SMT/PCBA)PCB fabricationElectronic component sourcingContract manufacturing / box build
English online orderingSource ↗
See all (13) →

Get 3 quotes

Get 3 quotes: Contract manufacturing / box build

Describe the part once. We send it to up to 3 shops that fit, and they quote you directly.

By sending this you agree we can share these details with up to 3 shops. Some shops pay us per request or a commission; that never changes your price. See the privacy policy and referral disclosure.

15 guides

Guides & articles

Everything we've written about Contract manufacturing / box build, starting with the basics.

Contract manufacturing / box build guides →
01Basics · 12 min

EVT, DVT, PVT explained

The three test builds between a working prototype and mass production, explained for first-time founders. What each build is for, roughly how many units you make, and what usually goes wrong.

02Basics · 10 min

How custom packaging is made: from dieline to finished box

The custom packaging process explained for hardware founders doing their first retail box. Box structures, printing, finishes, inserts, samples, MOQs and lead times, plus the Chinese words factories use.

03Design · 9 min

DFA and DFT: design for assembly and design for test, explained

How to design a product that's quick to put together and easy to test on a production line. The core design-for-assembly rules, what design for test means for circuit boards and finished products, and how Shenzhen factories use test fixtures.

04Design · 9 min

Engineering change orders (ECOs) and design freeze, explained

What design freeze means, why late changes are so expensive in hardware, and how engineering change requests, orders and notices (ECR, ECO, ECN) keep you and your factory on the same version.

05Cost · 10 min

How much does it cost to develop a hardware product?

The cost buckets of developing and manufacturing a hardware product, explained for first-timers. Design, prototypes, tooling, certification and the first production order, with typical ranges where they're widely published, plus the costs people forget.

06Basics · 9 min

How long does it take to develop a hardware product?

A realistic timeline for bringing a hardware product to market, stage by stage, for first-time founders. Where the time actually goes, what slows projects down in Shenzhen, and how to save weeks.

07Working in China · 10 min

How to choose a factory in China

A step-by-step, neutral guide for first-time hardware teams. How to find suppliers, tell factories from trading companies, check what you can, compare quotes, and start small.

08Choosing · 8 min

How to write an RFQ

What a request for quotation (RFQ) is, what to put in it, and how to write one that gets clear, comparable quotes from Shenzhen suppliers. With a checklist you can copy.

09Working in China · 9 min

Incoterms for first-timers: EXW, FOB, DDP and more

What Incoterms are, what EXW, FCA, FOB, CIF, DAP and DDP mean in plain words, who pays for what and who carries the risk, and which terms first-time importers from Shenzhen commonly use.

10Working in China · 8 min

NNN agreements explained

What an NNN agreement is, how it differs from a standard NDA, why it's commonly recommended when working with Chinese manufacturers, and what it can and can't do. Plain-English background, not legal advice.

11Basics · 11 min

Product development stages: how to make a physical product from idea to finished product

The stages of making a physical product, from first sketch to boxes on a ship, explained for first-timers. What happens at each stage, why it matters, what you get out of it, and who in Shenzhen helps.

12Basics · 10 min

Prototype to production: what changes when you scale from 10 units to 1,000

Why a product that works as 10 prototypes can fail at 1,000 units, what changes in parts, people, testing, documents and cash as you scale, and the steps between a working prototype and your first production run in Shenzhen.

13Working in China · 10 min

Quality inspection explained: pre-shipment checks and AQL

What pre-shipment inspection is, when to inspect, how AQL sampling works in plain words, what an inspector checks, and how to prepare so the report is actually useful. For first-time importers.

14Working in China · 9 min

Shipping from Shenzhen: sea vs air

Express courier, air freight or sea freight? A plain-English guide to shipping parts and products out of Shenzhen: how each option works, rough transit times, how weight is charged, batteries, and customs.

15Design · 9 min

What is a bill of materials (BOM)? How to write one

What a BOM is, why factories in China build and quote from it, the columns a good BOM needs, how to structure one for a hardware product, and the mistakes that cause wrong parts and delays.